Three workers in coveralls, full-face respirators and gloves lowering a cracked cement sheet into a heavy-duty waste bag behind barrier tape

Kent · England

Asbestos Removal for Lodge Lees

Asbestos removal for properties in Lodge Lees and Kent: removal of asbestos cement, coatings, tiles, flues and tanks.

  • Textured coatings
  • Cement water tanks in lofts
  • Old floor tiles and black adhesive

Get a quote Ring 07833 053 749

Asbestos removal near Lodge Lees

Asbestos removal in Lodge Lees

Before removal, the material has to be identified. If it hasn’t been tested, we sample it first, because the method depends on the material. Whether it’s old floor tiles and black adhesive and old waste on site, we cover flue pipes, floor tiles and gutters and downpipes and more.

In areas like Lodge Lees, outbuildings and farm buildings are common removal jobs, so we plan access across yards and fields. Every job comes with paperwork, which is useful when you sell, let or build.

Location
Lodge Lees (CT4)
Area hub
Kent
Covers
Asbestos removal to HSE guidance
Paperwork
Waste paperwork
Quotes
Written quote for your job
Telephone
07833 053 749
Updated
26 October 2026
Clear bags marked Danger Asbestos going into a van

Removing asbestos around Lodge Lees

Lodge Lees is about 7 miles north-west of Dover, in Kent. For removal jobs in Lodge Lees, tell us about parking and access when you get in touch. We work in all 922 towns and villages in Kent, from the larger towns to small villages. We work right across the region, from Lodge Lees to Canterbury (about 7 miles away).

If you let property near Shepherds Well station, void periods between tenants are a practical time for removal. Lodge Lees is within about 3 miles of the Kent Downs National Landscape; removing asbestos from rural buildings there follows the same rules, with access across yards and fields to plan.

We handle removal jobs in every part of the CT4 postcode area. Close by, we cover Denton (1 mile east), Breach (1 mile west), Wootton (1 mile south-east), Shelvin (1 mile east) and Selsted (2 miles south). Larger places within reach include Ashford (13 miles west), Canterbury (7 miles north-west), Dover (7 miles south-east), Folkestone (7 miles south), Ramsgate (15 miles north-east) and Whitstable (13 miles north-west).

Green spaces nearby include Cheriton Hill.

  • Pubs nearby include The Jackdaw Inn (under half a mile south-east)
Map of Lodge Lees © OpenStreetMap contributors

Step by step

On the day, we set up the work area first: barrier tape, signs and protection where needed, and keep the material wet as we work. Unexpected finds are discussed with you first before carrying on. We plan outdoor jobs in Lodge Lees to finish before dark: in late December it’s dark by about 3:50pm, while in June it stays light until about 9:15pm.

  1. Describe the material and send pictures
  2. If it hasn’t been identified, we sample it first
  3. We plan the method, controls, waste and any notification, and send a quote
  4. We remove the material with controls to keep fibres down
  5. The area is cleaned and the waste goes to a permitted site, with paperwork

How to prepare

  • Do not disturb the material before we get there
  • Ensure we can get to the area
  • Let neighbours know if the work is near them

Ask for a quote

We quote each job individually, because no two are the same. To start, ring 07833 053 749, or send the details through our contact page.

Ask for a quote

Read more

The scope of asbestos removal

Every job has limits; these are the usual ones:

  • Notifiable work has to be notified before it starts, so the timing needs planning
  • Making good is normally a separate job
  • Lagging, sprayed coatings and most insulating board are licensed work

If you are unsure, describe the job and send photos, and we will advise before you book.

Materials in Lodge Lees

  • Bitumen roof felt
  • Floor tiles and adhesive
  • Flue pipes
  • Gutters and downpipes
  • Garage and shed roofs
  • Soffits (cement)
  • Artex and textured coatings
  • Asbestos cement sheets
  • Water tanks
  • Panels and boards

More about this service

Weighing up your options

Sealing or enclosing is sometimes possible, but it remains in place and has to be recorded. Compare what each quote includes, not just the total: scope, method, waste disposal and paperwork.

Why choose us

  • Plain-English advice, including when to leave things alone
  • Work done to the regulations
  • Reports and results you can share
  • Identify first, remove only when needed

Read our prices page or published price ranges.

A closer look at the materials

Insulating board and lagging

It needs an HSE-licensed contractor and 14 days’ notice.

Bitumen and felt

We remove them without cutting with power tools.

Prices and what affects them

What drives the price:

  • How many samples are needed
  • The size of the job
  • Material and condition
  • Parking and access charges

Very low prices can mean corners are being cut: proper controls, lab analysis and legal waste disposal cost money.

Sending photos

The most useful photos are:

  • Street parking nearby
  • The access route
  • A close-up from a safe distance
  • A photo of the whole area

If you have a survey or test result, include it when you ring 07833 053 749, or send the details through our contact page; it helps us quote accurately.

After we have finished in Lodge Lees

After removal, the work area is cleaned, and you get the consignment note showing where the waste went.

A few practical points:

  • Tell us about any previous survey
  • Keep children and pets away on the day
  • Photos of the material and the route in help
  • File the consignment note

What to avoid

Ask any contractor how they’ll dispose of the waste, and ask for the consignment note.

Never sweep or vacuum asbestos debris; keep people away and ask for advice.

Doing it yourself?

Power tools, sanding and jet-washing release the most fibres.

Working on a fragile asbestos cement roof is dangerous in itself, quite apart from the asbestos, so never climb onto one.

Duty holders and landlords in Lodge Lees

Duty holders for workplaces and the shared parts of flats in Lodge Lees must manage asbestos under regulation 4 of the Control of Asbestos Regulations 2012. That means finding it, assessing it, recording it and planning how to manage it.

Void periods are a good time for asbestos work, when rooms are empty and work can be done without disruption.

Your questions about asbestos removal in Lodge Lees

Do you cover Lodge Lees and the area around Shepherds Well station?

Yes. Shepherds Well station is about 3 miles east of Lodge Lees, and we cover both.

Do you come out to small villages like Lodge Lees?

Yes. We cover villages and hamlets as well as towns. Tell us about access and parking.

Can asbestos be left in place?

Material in good condition that won’t be disturbed can often be left and managed. Keep a record and check it from time to time.

Should all asbestos be removed?

Not necessarily. Sound material that won’t be touched can often stay, as long as it’s recorded.

Can you come if the asbestos is damaged?

First, keep everyone away and don’t clean it up. Then contact us and we will advise on the next step.

How do I know if my property contains asbestos?

If it was built or refurbished before 2000, it may. Testing a sample is the only way to know.

How quickly can you come out?

We agree a date when you accept the quote. Some work has to be notified to the enforcing authority first, which affects timing.

Do I need a test or a survey?

A test checks specific materials; a survey checks a whole building or work area. For building work, a survey is usually needed.

  • Survey or test first when it isn’t clear what a material is
  • Work planned to the Control of Asbestos Regulations 2012 and HSE guidance
  • Everything in writing: quotes, reports, results and waste notes
  • Legal disposal at a permitted site, with a consignment note

How it works · Licensed or non-licensed? · Get a quote