West Sussex · England
Asbestos Survey for Felbridge
Asbestos survey in Felbridge: management, refurbishment and demolition, and pre-purchase asbestos surveys. Tell us what you’ve found and we’ll explain your options.
- Demolition and strip-out
- Common parts of flats and HMOs
- Shops, offices and industrial units
Need an asbestos survey in Felbridge?
How asbestos survey works in Felbridge
There are two main types of survey, set out in HSE’s guide HSG264. A management survey is for a building in normal use; a refurbishment and demolition survey is for before building work. We’ll tell you which suits your plans in Felbridge. Typical jobs include common parts of flats and HMOs and workplaces built before 2000, including floor tiles, textured ceilings and soffits.
Village houses like those in Felbridge have often been extended and altered over time, so we survey each part the work will disturb. Everything is explained in plain English, including when it’s better to leave a material in place.

- Area
- Felbridge (RH19)
- Area hub
- West Sussex
- What we do
- Asbestos surveys with lab-analysed samples
- Paperwork
- Survey report and lab results
- Quote
- Quoted individually, in writing
- Call
- 07833 053 749
- Last updated
- 26 October 2026
What happens
Each sample is sealed, labelled and recorded with its location, then sent to an accredited laboratory. We begin by confirming exactly what we’re doing, so there is no confusion.
- Let us know the address and why you need a survey
- We confirm the survey type and which rooms and outbuildings it covers
- On the agreed day, the surveyor inspects, photographs and samples
- Each sample is analysed by an accredited laboratory
- You receive the report, with results and what to do next
Getting ready
- Mention any damage before we arrive
- Make sure pets and children are elsewhere
- Tell neighbours if the work is close to their property
How to get a quote
Every job is quoted in writing. Ring 07833 053 749, or send the details through our contact page with the details.
Read more
Materials, one by one
Pipe lagging
If a survey finds asbestos lagging, the report will say so and recommend what to do, and it shouldn’t be disturbed.
Asbestos cement
Garage roofs, sheds and flues made from asbestos cement are common in surveys of older homes. How weathered and damaged it is affects what to do.
Why people call us in Felbridge
Until the 1999 ban, asbestos went into hundreds of building products. That’s why so many buildings in West Sussex can contain it, from garage roofs and soffits to textured ceilings and floor tiles.
These are the materials and situations that most often lead to surveys:
- Rented homes due for maintenance
- Contractors’ requests for an asbestos report
- Workplaces built before 2000
- Demolition projects
If you’re a landlord near East Grinstead station, share asbestos information with trades before work.
Questions to ask before booking
- What exactly is included: the areas, materials or samples
- How many samples are included
- Insurance appropriate to asbestos work
- Survey methods in line with HSG264
Asbestos surveys in Felbridge: local notes
Felbridge is about 2 miles north-west of East Grinstead, in West Sussex. We cover Felbridge as part of West Sussex, whatever the size of the job. Felbridge is one of 371 towns and villages in West Sussex where we work. You can also see our page for Crawley, about 6 miles away.
Altering an older house in Felbridge, wherever it is? Get the work areas surveyed before anything is opened up. For a school like Felbridge Primary School, the duty holder must manage asbestos and keep an asbestos register. Felbridge is within about 5 miles of the High Weald National Landscape, where farm buildings, barns and stables with cement roofs are common.
Here we cover the RH19 postcode area. From London Road, Mciver Close and Cherry Way or a nearby road, we can help. For properties just outside Felbridge, we cover Furnace Wood (1 mile west), Domewood (1 mile west), Snow Hill (2 miles west), Newchapel (2 miles north) and Crawley Down (2 miles south-west). Within a short drive, we also work in Crawley (6 miles west), Horsham (13 miles south-west), Haywards Heath (10 miles south), Burgess Hill (13 miles south), Broadfield (7 miles south-west) and Bewbush (8 miles west).
Other landmarks nearby include Effingham Park Motor Museum (1.8 miles west) and Queen Victoria Hospital (2.2 miles east). Green spaces nearby include Hedgecourt Lake.
- Schools near Felbridge include Imberhorne School (0.7 miles south-east) and Bush Davies School of Theatre Arts (1.5 miles east)
What it costs
Prices vary with:
- Roof spaces and outbuildings in scope
- How easy it is to reach
- The building’s size and layout
- How much sampling is needed
Our quotes are clear about VAT, so you can compare like with like.
What to photograph
For a quick quote, include:
- A rough size or measurement
- Damaged areas
- The access route
- A wide shot showing where the material is
For an accurate quote, tell us what you’ve found, where it is and what you are planning. Then call 07833 053 749 or use our quote form.
Options to consider in Felbridge
A low price can mean a narrow scope. Check how many samples are included, which areas are covered and what the report contains, before deciding. How easy the material is to reach affects the price, so tell us about access.
How we work in Felbridge
- Samples analysed by an accredited laboratory
- Plain-English advice, including when to leave things alone
- Practical recommendations
- Houses, flats and business premises
Take a look at how we price jobs and published price ranges.
Duty holders and landlords in Felbridge
Before maintenance in a rented home, agents may ask about asbestos. A test or a survey gives everyone a clear answer.
Before contractors start, they need to know about any asbestos. HSE’s campaigns stress this point to building owners and trades alike.
Places near Felbridge
Should you do it yourself?
Sanding, drilling, cutting and jet-washing are the worst things you can do to asbestos materials, so avoid them completely.
Fragile roofs are a serious falls risk, as well as an asbestos risk, so stay off it.
After the job
The survey ends with a written report: locations, results, condition and recommendations for every material in scope.
After we have finished:
- Ask for the report in a format you can share with contractors
- Survey first, then book the trades
- Clear access to lofts, garages, cupboards and outbuildings
- Have any old surveys or plans ready
Things not to do
Plan the survey early, before booking builders, so the results can shape your plans and your budget.
Please don’t break off pieces for us to look at: sampling is part of the survey, done with controls to keep dust down.
Questions from Felbridge
Can you survey a school or hall near Felbridge?
Yes, working with whoever is responsible for the building. Non-domestic buildings should have an asbestos register and management plan.
Do you work near East Grinstead station?
Yes. East Grinstead station is about 1.6 miles south-east of Felbridge, and we cover both.
Should all asbestos be removed?
Not always: sound material that will not be disturbed can often stay. It should be recorded and checked.
Is a home built after 2000 likely to contain asbestos?
Asbestos was banned in 1999, so a home built after 2000 shouldn’t contain it, though older parts, reused materials or earlier outbuildings can.
When can you start?
We agree a date when you accept the quote. Some work has to be notified to the enforcing authority first, which affects timing.
What’s the difference between a test and a survey?
Testing tells you about particular materials; a survey inspects the whole building or work area and records everything it finds.
Do I need a management or a refurbishment survey?
If the building is in normal use and you need to manage what’s there, a management survey. If you are about to refurbish or demolish, a refurbishment and demolition survey of the areas affected. We will recommend one when you tell us what you’re planning.
Do you cover Felbridge?
We do: our area includes Felbridge and the places around it. Send the postcode and a few photos and we will quote.
- Survey or test first when it isn’t clear what a material is
- Work planned to the Control of Asbestos Regulations 2012 and HSE guidance
- Written paperwork: reports, results and waste consignment notes
- Waste sealed and labelled, then taken to a permitted site