Surrey · England
Asbestos Surveys in Shipley Bridge, Surrey
Asbestos survey in Shipley Bridge: asbestos surveys for homes, landlords and businesses. Planned to HSE guidance, with written results and paperwork.
- Demolition of garages, extensions and buildings
- Planned refurbishment work
- Schools, halls and community buildings
Asbestos help in Shipley Bridge
How asbestos survey works in Shipley Bridge
If a building in Shipley Bridge dates from before 2000, or was refurbished before then, it may contain asbestos. A survey is the way to find out: we inspect, sample suspect materials and write up what we find. From schools, halls and community buildings and the communal parts of blocks of flats, we deal with flues, textured ceilings and garage roofs and more.
Village surveys around Shipley Bridge can include extensions, stores and stables as well as the house. Every job comes with paperwork, because buyers, landlords and builders often ask for it.

- Location
- Shipley Bridge (RH6)
- Area hub
- Surrey
- What we do
- Surveys for homes, landlords and businesses
- Afterwards
- A written report with lab results
- Price
- Quoted individually, in writing
- Telephone
- 07833 053 749
- Page updated
- 26 October 2026
Choosing the right option
Do you need a full survey, or just a test? Testing tells you about the materials you sample, and nothing else; a survey looks at the whole building or work area and finds materials you might not have noticed. How easy the material is to reach affects the price, so tell us about access.
Why us?
- Houses, flats and business premises
- Across London and the South East
- Recommendations in plain English
- Clear advice on your options
Take a look at how we quote or the cost guide.
What we deal with in Shipley Bridge
Materials age: something in good condition when it was fitted may now be damaged, which a survey records.
You cannot tell by looking, but these are common reasons people contact us:
- Demolition of garages, extensions and buildings
- Schools, halls and community buildings
- Shops, offices and industrial units
- Checks on rental property
If you let flats or houses near Gatwick Airport station, asbestos information should be ready for contractors before maintenance.
What your quote should include
- Whether extra samples cost more
- Survey methods in line with HSG264
- What the report or result will contain
- Which laboratory analyses samples
Can I do it myself?
Power tools, sanding and jet-washing release the most fibres, so avoid them completely.
DIY sampling means disturbing the material yourself. HSE recommends a competent person takes samples.
Places near Shipley Bridge
Other services in Shipley Bridge
What’s included, and what isn’t
Every job has limits; these are the usual ones:
- A management survey is only minimally intrusive, so it will not do before building work
- Areas we can’t safely reach are listed in the report, and must be treated as containing asbestos until checked
- A survey reflects the building on the day; materials can deteriorate, so condition should be checked again over time
If you’re unsure, describe the job and send photos, and we’ll advise before you book.
Common materials
- Ceiling tiles
- Boiler cupboards and panels
- Garage and shed roofs
- Pipe lagging
- Soffits and porch canopies
- Floor tiles and adhesive
- Roofing felt and bitumen
- Artex and textured coatings
- Cement sheets and cladding
- Water tanks and flues
Duty holders and landlords in Shipley Bridge
Letting agents often ask about asbestos before maintenance work. A test or survey gives a definite answer.
For managing agents and freeholders in Shipley Bridge, the register for shared areas needs keeping current and sharing with trades, and condition checked regularly.
Questions from Shipley Bridge
Do you cover Shipley Bridge and the area around Gatwick Airport station?
Yes. Gatwick Airport station is about 1.2 miles north-west of Shipley Bridge, and we cover both.
Do you come out to small villages like Shipley Bridge?
Yes. We cover villages and hamlets as well as towns. Tell us about access and parking.
Could my home contain asbestos?
You cannot tell by eye. A sample analysed in a laboratory is the reliable way to find out, especially in buildings from before 2000.
Will the survey damage the property?
Sampling leaves small, sealed sample points. A refurbishment and demolition survey is intrusive by design, because it has to look inside the fabric of the building.
How can I get a price?
Just use our quote form or call 07833 053 749. Include the postcode, a description and photos.
What should I do if I’ve disturbed asbestos?
Stop work, leave the area and don’t try to clean up. Then get advice; if you are worried about your health, speak to your GP.
Does asbestos always have to come out?
No. Material in good condition that won’t be disturbed can often be left and managed. Keep a record and check its condition.
What does the survey report include?
The materials found, their locations, the laboratory results, their condition, photographs and recommendations. Any areas we couldn’t access are listed.
Surveying buildings in Shipley Bridge
Shipley Bridge is about 2 miles south-east of Horley, in Surrey. For surveys in Shipley Bridge, tell us about parking and access when you get in touch. We cover 395 places in Surrey.
Planning work on an older building in Shipley Bridge, whether near Church of St Bartholomew or elsewhere? The rooms being worked on need surveying before the builders arrive. Schools such as Forge Wood Primary School are non-domestic premises, so whoever runs them has a duty to manage asbestos and keep a register; we survey non-domestic buildings by arrangement with the duty holder.
Anywhere in RH6, an asbestos survey is available. Streets in the area include Antlands Lane, Antlands Lane East and Peeks Brook Lane, and an asbestos survey is available on all of them. Neighbouring places we cover include Burstow (1 mile north-east), Fernhill (1 mile north), Tinsley Green (1 mile south-west), Copthorne (1 mile south-east) and Forge Wood (1 mile south-west). Larger places within reach include Epsom (14 miles north-west), Redhill (6 miles north), Ewell (15 miles north), Reigate (7 miles north-west), Caterham (10 miles north) and Dorking (10 miles north-west).
Well-known places in the area include Effingham Park Motor Museum (2.1 miles east) and County Mall (3.2 miles south-west). Within reach you’ll find Hedgecourt Lake.
- Local schools include The Gatwick School (1.4 miles south-west) and Oakwood School (1.9 miles north-west)
- Nearby, you will find The Shipley Bridge pub (less than half a mile east)
What it costs
Quotes vary because of:
- The size and age of the building
- Lofts, voids and outbuildings to include
- How many samples are needed
- The quantity or area
Dealing with asbestos before building work is normally cheaper than finding it mid-job, when the whole project can be held up.
Photos that help
Good photos help us plan and quote. Take them without disturbing anything:
- Labels, if any
- A rough size or measurement
- Cracks or breaks
- A clear close-up
Unsure whether you need a test, a survey or removal? Send photos through our quote form, or phone 07833 053 749, and we will advise.
Step by step
On the day, the surveyor walks through the areas in scope, checks every suspect material and takes small samples, wetting and sealing each sample point to keep dust down. On the day, we check the area and talk you through the plan first.
- Start by telling us about the property and your plans
- We set out the survey type, the areas covered and the price in writing
- Our surveyor inspects and takes small samples of suspect materials
- An accredited laboratory analyses the samples
- We send the report with results and recommendations
Before we arrive
- Let neighbours know if the work is near them
- Have any previous surveys or test results ready
- Keep away from the material in the meantime
How to get a quote
Every job is quoted in writing. Just call 07833 053 749 or use our quote form with the details, including any survey or test you already have.
Related guides
After we’ve finished in Shipley Bridge
Keep the report somewhere safe and share it with anyone working on the building, so they know what to avoid or plan around.
Staying safe afterwards:
- Ensure we can get into the loft, garage and cupboards
- For flats, ask the managing agent for the asbestos register for the common parts
- Tell us about any areas that are locked or unsafe
- Ask for the report in a format you can share with contractors
Don’ts
Until the survey is done, don’t drill, sand, cut or break suspect materials, and keep trades away from them.
Book the survey before the builders, so there’s time to deal with anything it finds.
- Identify it first: we test or survey before planning removal
- Work planned to the Control of Asbestos Regulations 2012 and HSE guidance
- Paperwork for your records: reports, lab results and consignment notes
- Waste sealed and labelled, then taken to a permitted site