Greater London · England
Asbestos Removal Services in New Addington, Greater London
Asbestos removal in New Addington, from older homes to workplaces. Every job is quoted in writing.
- Vinyl and thermoplastic tiles
- Sheds, outbuildings and lean-tos
- Cement water tanks in lofts
Asbestos removal for New Addington
Asbestos removal in New Addington
In homes, in New Addington as elsewhere, the usual materials are cement products, textured coatings and floor tiles. HSE treats work on these as non-licensed or notifiable non-licensed in most cases, which still means proper controls. Typical materials include textured coatings, gutters and downpipes and cement roof sheets, and typical jobs are vinyl and thermoplastic tiles and old flues.
In New Addington, removal often involves flats, small gardens and limited access, so access and parking are planned carefully. We start with a clear answer: what the material is, and what that means for your plans.
- Location
- New Addington (CR0, CR9)
- Region
- Greater London
- Covers
- Removal of cement, coatings, tiles, flues and tanks
- Afterwards
- Consignment note for the waste
- Quote
- Written quote for your job
- Call
- 07833 053 749
- Page updated
- 26 October 2026

Looking after things afterwards
After removal, the work area is cleaned, and you receive the waste paperwork.
Looking after any asbestos that remains:
- Ensure pets and children are elsewhere
- Let us know where we can park
- Photos of the material and the route in help
- Plan any replacement work before the removal date
Avoid these
Do not sweep, vacuum or brush up broken asbestos debris.
Never sweep or vacuum asbestos debris.
Weighing up your options
Should it come out? Sound material that will not be disturbed can often stay; if it’s damaged or the work will disturb it, removal makes sense. How easy the material is to reach affects the price, so photos of the area and the way in help us quote accurately.
Why people choose us
- Houses, flats and business premises
- Jobs planned to HSE guidance
- Quotes that spell out the scope
- Waste taken to a permitted site with a consignment note
Read our prices page or the cost guide.
What it costs
We base our quote on:
- Access: height, lofts, steps and space
- Travel and parking
- How much waste there is
- How much there is
Dealing with asbestos before building work is usually cheaper than finding it mid-job, when the whole project can be held up.
Photos that help
When you send photos, these help most:
- Approximate dimensions
- How we’d reach it
- A close-up from a safe distance
- Street parking nearby
Include any existing survey or test when you fill in the enquiry form or give us a call on 07833 053 749; it helps us quote accurately.
Questions from New Addington
Do you work in New Addington despite London parking restrictions?
We do. Tell us about parking, permits and access so we can plan; all of Greater London is inside the ULEZ.
Do you cover New Addington and the area around Hayes (Kent) station?
Yes. Hayes (Kent) station is about 2.6 miles north-east of New Addington, and we cover both.
What paperwork will I get?
That depends on the job: a survey report, a laboratory result, or a consignment note for removed waste.
Is asbestos dangerous?
It can be, if fibres are released and breathed in. Diseases linked to it, such as mesothelioma and asbestosis, can appear many years later, so the aim is never to disturb it unknowingly.
Do I need to move out?
That depends: outdoor work rarely means leaving. For indoor work, the area is closed off and kept clear until we’ve finished.
Do you need a licence to remove asbestos?
It depends on the material and the job. Cement and textured coatings are normally non-licensed; lagging, sprayed coatings and most insulating board are licensed.
Does asbestos always have to come out?
Not always: sound material that will not be disturbed can often stay. It should be recorded and checked.
Can you help with a flat?
Yes. For shared areas, ask the managing agent about the asbestos register.
What we do and do not cover
The usual limits are:
- We don’t remove anything until it’s been identified
- Some jobs must be notified first, so the timing needs planning
- Making good is normally a separate job
Not sure what you need? Send us photos and we’ll tell you honestly before booking.
Materials we see
- Artex and textured coatings
- Gutters and downpipes
- Garage and shed roofs
- Panels and boards
- Water tanks
- Bitumen roof felt
- Floor tiles and adhesive
- Asbestos cement sheets
- Flue pipes
- Soffits (cement)
What happens
Once removal is finished, we clean and check the area, and we talk you through what was done. Our team uses the right protective equipment, and use controls to keep dust down. In winter, the light goes in New Addington by about 3:55pm, so outdoor jobs start early.
- Describe the material and send pictures
- We test the material if needed
- We plan the job and send a written quote
- We remove the material with controls to keep fibres down
- We clean up, dispose of the waste legally and send the consignment note
Before we arrive
- Clear access to the area, loft or garage
- Clear belongings, but leave the material alone
- Have any previous surveys or test results ready
Getting a price
You’ll get a written quote. Just call 07833 053 749 or use our quote form with the details.
Read more
Places near New Addington
More for properties in New Addington
Materials, one by one
Textured coatings
Taking the boards down can be an alternative.
Bitumen and felt
They’re removed by hand.
Asbestos removal in New Addington: local notes
New Addington is about 4 miles south-east of Croydon, in Greater London. For removal jobs in New Addington, tell us about parking and access. New Addington is one of 764 towns and villages in Greater London where we work. We work right across the region, from New Addington to London (11 miles away).
If you let property near Hayes (Kent) station, void periods between tenants are a practical time for removal. In older buildings across New Addington, asbestos may be in later additions, so materials are identified first.
Anywhere in CR0 and CR9, asbestos removal is available, from busy streets to quiet lanes. Local streets include Bothwell Road, Windham Avenue and Gascoigne Road; we cover every one. Other places close to New Addington we cover include Forestdale (1 mile west), Fickleshole (1 mile south), Addington (1 mile north-west), Farleigh (1 mile south-west) and Selsdon (2 miles west). We also cover nearby towns such as London (11 miles north), City of Westminster (13 miles north-west), Marylebone (13 miles north-west), Kensington (14 miles north-west), St Pancras (13 miles north) and Shoreditch (13 miles north).
As a London location, New Addington is inside the ULEZ, and parking and loading need planning: let us know about parking and access when you get in touch.
Nearby you will also find Warlingham Park Hospital (1.8 miles south) and Bethlem Museum of the Mind (3.3 miles north-east). Open spaces near New Addington include Nore Hill and Hutchinson's Bank.
- Schools near New Addington include Meridian High School (0.9 miles south-east)
Where asbestos turns up
Selling or letting a property can prompt removal of obvious materials, though in good condition it does not always need to go.
Typical jobs in New Addington include:
- Materials found mid-project
- Broken sheets in gardens
- Flue pipes, gutters and downpipes
- Floor tiles before a new floor
At a school such as Rowdown Primary School, removal would be arranged with the duty holder, with the area empty.
Before you book anyone
- VAT, clearly stated
- Waste disposal and the consignment note
- That samples are analysed by an accredited laboratory
- What’s excluded, such as making good or a new roof
Doing it yourself?
DIY sampling means disturbing the material yourself. HSE recommends a competent person takes samples.
A professional job comes with paperwork: results, a report or a consignment note, which buyers and builders may ask for.
- Identify it first: we test or survey before planning removal
- Work planned to the Control of Asbestos Regulations 2012 and HSE guidance
- Written paperwork: reports, results and waste consignment notes
- Waste sealed and labelled, then taken to a permitted site